Future Site of RCC January Map |

End Bent Piles at Bridge 10-B |

Pier Footing at Bridge 10-B |

Construction of Bridge 10-B at the Rental Car Facility Site |

Future Ramp I as part of the MIC Terminal Access Roads |

Expansion of 25th Street Showing Inlets in Place.
|

MSE Wall Level Impact for
Ramp-R |

North View of RCC Construction Site |

North View of RCC Construction Site |

RCF Foundations / MTAR |

20 Inch Forcemain at Wyndham |

Drainage Work along 21st Street |

MIC Office Parking Lightposts Added |

Drainage Work at 25th Street Completed |

Standard Penetration Test (SPT Borings) at MIC Station. |

Drilled Shaft for the MIC-MIA Connector |

Drilled Shaft for the MIC-MIA Connector |

Preparation of Drilled Shaft |

MSE Wall Level Impact for
Ramp-R at Bridge 10-B |

Northwest View of RCC Construction Site |