To be built, the Miami Intermodal Center (MIC) Program required going through a Right of Way (ROW) process in order to acquire the land needed for the MIC’s construction. 

FDOT initiated a speedy ROW acquisition plan in order to secure to rights over the needed land, due west of Miami International Airport (MIA). By 2003, 81 parcels totaling approximately 141 acres had been secured for construction of the Rental Car Center (RCC), Miami Central Station (MCS), roadways improvements and the joint development component.  Click here for a map view.

The MIC Program’s ROW: 

  • MIC ROW Area 1 – 33 Parcels – RCC and MIC Terminal Access Roadways (MTAR)

Completed in September 2002, this portion is for the construction of the RCC and for the MTAR, which will facilitate roadway movements around the RCC. Geographic Boundaries: NW 25th Street, NW 39th Avenue, NW 21st Street and NW 42nd Avenue (Le Jeune Road).

  • MIC ROW Area 2 – 20 Parcels – Le Jeune Road

Completed in April 2003, this portion of the MIC project area along Le Jeune Road South will be acquired to allow for improvements to Le Jeune Road, and for construction of a portion of the future SR 836/SR 112 Interconnector, which will provide direct connection to the MIC and MIA, and for the possible construction of a future East-West Rail.  Geographic Boundaries: The Le Jeune Road strip is from NW 21st Street south to the SR 836 Interchange.

  • MIC ROW Area 3 – 28 Parcels – MCS and MTAR

Completed in December 2003, this portion of the area is the site of the future MCS, a terminal in
which various transportation systems will converge and for the MTAR which will facilitate roadway
movements around the MCS. Geographic Boundaries: NW 25th Street, NW 37th Avenue, NW 21st
Street and NW 39th Avenue.
 
All ROW was acquired under the eminent domain provisions of Florida Statute 337, Chapters 73 and 74, and was in full compliance and consistent with the Uniform Relocation Assistance and Real Property Acquisition Policies Act and FDOT’s Right of Way Procedures Manual.  The right of way acquisition process included the following steps: appraisal report, appraisal review, acquisition, environmental assessments, lawsuit preparation, relocation, and property management. 

Although the ROW acquisition process was completed on 2003, ongoing property management services continue today.  Certain rental car company operations within the future MCS boundaries have not been cleared.  These continue to operate on-site until they can relocate into the RCC upon its completion.  Once they have relocated, site clearing will begin to make way for the MCS construction and the joint development component.  

The MIC-Earlington Heights Extension Project will also be requiring a ROW acquisitions process that will be implemented through the Miami-Dade Transit Authority (MDT).  For information click here or contact the MDT Public Involvement unit by phone at 305-375-5453, fax at 305-372-6150, or email at .